Customization: | Available |
---|---|
Type: | Universal Type |
Transmission: | Hydraulic Transmission |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Shantui 130HP Crawler Track Bulldozer (SD13S)
The extended track ensures low ground pressure, high reliability and strong traction, contributing to precise operation;
The power shift transmission not only ensures smooth power shift, but also reaches target speeds and carries out directional transfers with a single control lever;
The wet steering clutch and brake can extend service life. They work interactively, ensuring quick and flexible steering operations;
The single control lever can control all blade actions;
The drift sealing in the drive wheel, track roller and carrier roller can prevent dust from entering the track system, as well as lubricant leakage, thereby ensuring a long service life;
The hexahedron cab features wide visibility, and the insulation materials in the cab can reduce noise and vibrations;
The spin type fuel filter and dust separator, the air filters and the other filtration devices can prolong work time and reduce service time;
The comfortable cab seat can adjust upward and downward, forward and backward, meeting any positional needs the operator may have;
Side engine operation and the combination of a drive/brake operation system and foot brake makes overall operation of the bulldozer more rapid and convenient.
Product Description:
Type |
SHANGCHAI D6114ZG4B(water cooled, in-line, direct injection and turbo charge) |
Rated revolution |
1900rpm |
Rated power |
95.5kw |
Cylinder number-bore x stroke |
6-114 x 135 |
Piston displacement |
8.27L |
Rated fuel consumption |
<=228g/kW.h |
Max. Torque |
674.m/1300rpm |
Type |
Swing type of sprayed beam, suspended structure of equalizer bar |
Carry rollers |
2 each side |
Track rollers |
6 each side |
Track type |
Single teeth. Dry type |
Width of track shoes |
460mm |
Pitch |
190mm |
Max. Pressure |
14MPa |
Pump type |
Gear pump |
Discharge |
180L/min lated revelation |
Working cylinder x number |
90mm x2 |
Torque converter |
3-element, 1 stage, 1 phase |
Transmission |
Forced connected, planetary gear |
Main drive |
Spiral bevel gear, splash lubrication |
Steering clutch |
Wet, Multi-disc, spring loaded, hydraulic helping operation, mechanical separating, linking steering brake |
Steering brake |
Wet, floating, band type foot stepping brake with hydraulic helping |
Final drive |
2-stage speed reduction of spur gear, splash lubrication |
Blade |
Straight-tilt |
Angle |
Min. Ground clearance(mm) |
320 |
320 |
Operating weight(kg) |
14000 |
14500 |
Ground pressure(MPa) |
0.064 |
0.064 |
Gradeability |
30 |
30 |
Track gauge(mm) |
1880 |
1880 |
Dozing capacity(m3) |
3.7 |
3.4 |
Blade height(mm) |
1090 |
915 |
Blade width(mm) |
3185 |
3745 |
Max. Drop below ground(mm) |
590 |
590 |
Max. Tilt adjustment(mm) |
400 |
400 |
Photos:
1.. Which countries do we export to?
Asia: Vietnam, India, Indonesia, Pakistan, Kazakhstan, Uzbekistan, etc.
Europe: Russia, Belarus, Ukraine, Lithuania, Saudi Arabia, etc.
South America: Brazil, Chile, Paraguay, Argentina, etc.
Africa: South Africa, Ethiopia, Libya, Ghana,Algeria,etc.
2.What are our advantages compared with other manufacturers/factories?
1)Reliable Quality: Carefully select regular manufacturers for supporting spare parts,like engines,bridge,transmissions,and many parts designed and produced by ourselves,
always adapting the best materials.
2)Competitive Price: Concentration of mechanized production in large quantities reduce
production cost to ensure that our price is competitive.
3)Service Team: First, our sales managers are online 24 hours,ready to answer your
questions at any time. Second, professional maintenance team with senior technicians,
ready to provide support services to users and dealers. Most problems can be solved
within 24 hours.
4)Fast Delivery:Under normal circumstances,we can delivery with 10 working days in
factory after receiving pre-payment.
3.Which payment terms can we accept?
Normally we can work on T/T or L/C.
1)On T/T term, 30% payment is required in advance for production, 70% balance shall
be paid before delivery or against the copy of original B/L for old long cooperation clients.
2)On L/C term, 100% irrevocable L/C at sight without "soft clauses" can be accepted.
4. How long is the validity of our quotation?
As a reliable supplier, basically our price remains stable through one year, we only adjust
our price based on two situations:
1)The rate of USD
2)TheThe price of material
Other questions, please contact me directly!